The Building Permit card must be posted so it can be seen from a public right-of-way.
Inspections
- Inspections require a minimum of 48 hours notice.
- See list on back of the permit.
- Rule of thumb is never cover up work without an inspection and if a system within the building is completed, call for an inspection.