OWNER'S RESPONSIBILITIES
Post Permit
The Building Permit card must be posted so it can be seen from a public right-of-way.
Inspections
- Inspections require a minimum of 48 hours notice.
- See list on the back of the permit.
- A rule of thumb is never cover up work without an inspection and if a system within the building is completed, call for an inspection.
Documents to Download
Permit to Construct
Energy Efficiency Design Application (not for Accessory Buildings)
Contractor's Letter of Authorization