
Business (33)
Children categories

Active Planning Applications (2)

Active Zoning Amendment Applications
The following list contains the current Zoning Amendment applications for the Township of Drummond/North Elmsley. For information on current development applications, please contact the Planning Division at 613-267-6500 ext. 230.
Renovations to existing dwellings or adding an additional residential unit (ARU) may reduce the performance level of the sewage system in the following situations:
- the number of bedrooms in the dwelling are increased
- the proposed construction exceeds 15 percent of the gross area of the dwelling unit
- new plumbing fixtures are added to the dwelling, or
- if the addition or ARU, expansion, alteration or change proposed encroaches upon the sewage system or any of its components, or area required for future replacement
If any of the above applies and the results show that the daily design sewage flow of the dwelling exceeds the capacity of the sewage system components, then the system must be upgraded to accommodate the increased flow rate.
Other structures, including garages (attached or detached), swimming pools or buildings that may reduce the performance level due to their proximity to the sewage system, are also included in the requirements for an application if they are within a 15 metre distance.
Applicants who propose the foregoing must apply for a Sewage System Maintenance Inspection to the Township for approval prior to applying for the municipal building permit. The fee is found here.
The Township assumed responsibility for septic inspections on October 1, 2022. Before that date Leeds, Grenville and Lanark District Health Unit was responsible for septic inspections.
To request a file search related to a private sewage disposal system Installed after 1973 please email This email address is being protected from spambots. You need JavaScript enabled to view it.
In your inquiry, please include the property owner’s name, property address, and the approximate date of the installation.
Please note that we are not always able to provide you with records.
Septic Applications | Permit Fee |
---|---|
Sewage System Permit - For private sewage systems with flows up to 10,000 litres/day1 | $775.00 |
Tertiary Sewage System Permit - Require Maintenance Agreement (for annual inspection)2 | $850.00 |
Permit Renewal/Revision with no inspection | $65.00 |
Permit Renewal/Revision with site inspection | $220.00 |
Third Party Certificates | $65.00 |
Maintenance Inspections - including septic tank replacement only, alterations, Class 2 & 3 sewage systems | $385.00 |
Site Inspections - minor variances/zoning by-laws/building renovations/septic re-inspections | $220.00 |
Severance Applications First lot Subsequent lots |
$443.00 $180.00 |
Subdivision Plan Review Non Communal Sewage Systems |
$215.00 per lot up to a maximum fee of $5,000.00 plus 13% HST |
File Searches | $125.00 |
1 - The Ministry of the Environment will be responsible for sewage works where the design capacity is in excess of 10,000 litres/day under the Ontario Water Resources Act.
2 - Tertiary Treatment Systems (Level 4 Treatment) are Ecoflo, Eljen, Waterloo Biofilter, ATL, EnviroSeptic, Norweco, and Biomicrobics and require Maintenance Agreements upon installation completion.
Payment Options
- Cash
- Cheque
- Debit
- E-transfer payments can be arranged by emailing This email address is being protected from spambots. You need JavaScript enabled to view it.
DO NOT SEND THE EFT TO THIS EMAIL
What Steps Can I Take to Ensure My Septic System Functions Properly?
A sewage system which has been properly installed, should, with proper care and maintenance provide many years of service. There are, however, some things which individuals need to be aware of which will help the system function properly.
- Avoid putting the following into a septic system:
- Fats, oils and grease
- Gasoline, antifreeze
- Varnishes, paints and solvents
- Caustic drain and harsh cleaners
- Photographic solutions, bleach, pesticides
- Nail polish remover
- Cat box litter
- Tampons, sanitary napkins, diapers, paper towels, condoms
- Plastics
- Coffee grounds, eggshells and other kitchen waste
- Direct roof drains, sump water and surface water away from the sewage system.
- Discharge water from softeners and iron filters should not be directed into the sewage system unless the system has been designed to accept such discharges.
- Water usage in the home should be kept to a minimum. Excessive use, such as doing numerous loads of laundry in one day, could flush solids from the treatment unit (septic tank) into the leaching bed.
- There should be no need to use “starters”, “bacterial feeds” or “cleaners”.
- The treatment unit should be inspected at regular intervals and pumped out whenever sludge and scum occupy 1/3 of the working capacity of the tank. Because they contain deadly gases, septic tanks should only be inspected by firms specializing in this work.
- Vehicular traffic (including snowmobiles) should not be allowed over the leaching bed.
- The area over a leaching bed should have a good cover of grass allowing for adequate sunlight and ventilation to be maintained. Avoid planting shrubs and trees over this area.
How Can I Recognize If My Septic System is Having Problems?
Types of Septic Permits and How to Apply
The Different Classifications of Sewage Systems & Required Clearances
Septic Services
Septic/Building Services Contact Information
Peter Echlin, CBO
This email address is being protected from spambots. You need JavaScript enabled to view it.
Phone: 613-267-6500 ext. 240
Rick Patterson, Building Inspector
This email address is being protected from spambots. You need JavaScript enabled to view it.
Phone: 613-267-6500 ext. 213
Kyra Dobbie, Development Services Clerk
This email address is being protected from spambots. You need JavaScript enabled to view it.
Phone: 613-267-6500 ext. 232
Additional Info
- Tender/RFQ Code Road Landfill Monitoring and Annual Report
- Department Public Works
- Contact Clint Bron
- Email This email address is being protected from spambots. You need JavaScript enabled to view it.
- Due Date Wednesday, 07 May 2025
- Time 11:00am
Additional Info
- Tender/RFQ PW-2025-003
- Department Public Works
- Contact Laura Code
- Email This email address is being protected from spambots. You need JavaScript enabled to view it.
- Due Date Tuesday, 06 May 2025
- Time 11:00am
ZA-25-02 1000543881 Ontario Inc
Subject Lands: 949 Drummond Concession 7, Part Lot 21, Concession 6 Drummond Part 2 of 27R-4419
Public Meeting: 3:00 pm on April 22, 2025
The purpose of the application:
EXPLANATORY NOTE This by-law applies to those lands described located within Phase 1 of the Mobile Home Park Development, which is to be developed in two phases.
THE PURPOSE OF THE BY-LAW IS to amend the Township of Drummond/North Elmsley Comprehensive Zoning By-law 2012-060 to remove the holding provision from the subject lands to permit development.
The full Notice of Intent to Lift Holding Symbol is available below under documents.
ZA-25-01 - 6056628 Canada Inc
Subject Lands: Part 1, 27R-5951, Lot 1 Concession 3, Drummond
Public Meeting: 3:00 pm on March 25, 2025
The purpose of the amendment is to:
- Change the zoning of the lots conditionally approved by consent application B24/114 and B24/115 from Multiple Residential Exception 1 (MR-1) to Rural (RU).
- Change the zoning of the lot conditionally approved by consent application B24/116 from Multiple Residential Exception 1 (MR-1) to Rural Exception X (RU-X) with Parking Lot being an additional permitted use
The full Notice of Public Meeting is available below under documents.
More...
The Planning Department is there to help guide the way the Township grows and is responsible for ensuring the orderly development of both the rural areas and our hamlets. Land use planning is a process which ensures that land and resources are effectively managed and that growth occurs in a manner that the community desires. The planning process is governed by the Province’s Planning Act, and it is the Township’s Official Plan and Zoning By-law which are the daily tools we use to promote attractive and sustainable development while limiting negative impacts on people, neighbours and the environment.
Planning Department Contact Information
Brady McGlade, Planner
This email address is being protected from spambots. You need JavaScript enabled to view it.
Phone: 613-267-6500 ext. 230
Kyra Dobbie, Development Services Clerk
This email address is being protected from spambots. You need JavaScript enabled to view it.
Phone: 613-267-6500 ext. 232
Please note a minimum of 48 hours notice is required for inspections

Apply for a building or demolition permit using the online portal

Apply for a building or demolition permit using the PDF form

Request a building inspection

Septic Services

Frequently Asked Questions
Building Services Team
Peter Echlin
Chief Building Official
613-267-6500 ext. 240
This email address is being protected from spambots. You need JavaScript enabled to view it.
Rick Patterson
Building Inspector
613-267-6500 ext. 213
This email address is being protected from spambots. You need JavaScript enabled to view it.
Permit Fees
Building Permit Fee Schedule Excerpt From Tariff of Fees | |
---|---|
Residential Permits (Group C) | Permit Fee |
New construction for residential and seasonal use. Includes plumbing, additions, renovations, accessory buildings and repair & replacement | $15.00 per $1000.00 for the first $100,000.00 and $5.00 per $1000.00 over $100,000.00 of Construction Value* Minimum permit fee is $150.00 |
Assembly, Commercial, & Industrial (Group A,B,D,E,F) | Permit Fee |
New construction, additions and renovations of Assembly, Commercial and Industrial buildings. Includes plumbing and accessory buildings | $15.00 per $1000.00 for the first $100,000.00 and $5.00 per $1000.00 over $100,000.00 of Construction Value Minimum permit fee $250.00 |
Farm Structure ** | Permit Fee |
Farm structure Up to 1500 sq. ft. Includes alteration or repair of existing | $8.00 per $1000.00 of Construction Value |
Farm Structure 1501 to 6450 sq. ft. | $10.00 per $1000.00 for the first $100,000.00 and $5.00 per $1000.00 over $100,000.00 of Construction Value |
Farm Structure Greater than 6450sq. ft. | $12.00 per $1000.00 for the first $100,000.00 and $5.00 per $1000.00 over $100,000.00 of Construction Value |
Miscellaneous | Permit Fee |
Solid Fuel Appliance (Wood stove, fireplace, outdoor boiler) | $150.00 |
Swimming Pool | $150.00 |
Demolition Permit | $150.00 |
Plumbing Alteration | $150.00 |
Hydronic Heating | $150.00 |
Rooftop Solar Projects (Residential) | $15.00 per $1000.00 of Construction Value Minimum permit fee $150.00 |
Transfer of Permit to New Owner | $100.00 |
Conditional Permit | $150.00 and Signed Agreement |
Re-activation of Permit | $150.00 + $100.00/Inspection |
Change of Use | $150.00 Compensating Construction $15.00 per $1000.00 for the first $100,000.00 and $5.00 per $1000.00 over $100,000.00 of Construction Value |
Investigations/Construct Without Permit or Authorization | Permit Fee |
Discretionary surcharge for commencing construction without a permit or authorization | Additional 100% of Permit Fee |
*Construction value based upon current Construction Index of Eastern Ontario
**As defined in the Ontario Building Code
Download a copy of the Building Permit Fees
Septic Fees
Sewage System Permit - For private sewage systems with flows up to 10,000 litres/day | $775.00 |
---|---|
Tertiary Sewage System Permit Require Maintenance Agreement (for annual inspection) | $850.00 |
Permit Renewal/Revision with no inspection | $65.00 |
Permit Renewal/Revision with site inspection | $220.00 |
Third Party Certificates | $65.00 |
Site Inspections – including Septic Tank Replacement Only, Alterations, Class 2 & 3 Sewage Systems. | $385.00 |
Maintenance Inspections Minor Variances/Zoning By-Laws/Building Renovations/Septic Re-inspections | $220.00 |
Mandatory Septic Inspections | $0.00 |
Severance Applications: | |
First lot | $443.00 |
Subsequent lots | $180.00 |
Subdivision Plan Review | $215.00 per lot up to a max. fee of $5,000.00 + 13% HST |
File Searches | $125.00 |
Other fees that may be applicable:
Township Development Charges:
Residential | Green Energy | Non-Residential | ||||
---|---|---|---|---|---|---|
Single & Semi Detached Dwelling | Other Multiples | Apartments - 2 Bedrooms + | Apartments - Bachelor & 1 Bedroom | Special Care/Special Dwelling Units | (per 500kW generating Capacity) | (per sq.ft. of Gross Floor Area) |
$6,135 | $4,621 | $3,499 | $2,507 | $2,364 | $4,436 | $2.40 |
Lanark County Development Charges : $1,036.00
Civic Address Sign : $120.00
Township Entrance Permit : $1,000 ($900 refundable deposit). For entrance onto a County road contact Lanark County at 613-267-4200
Electrical Permit see Electrical Safety Authority (1-877-372-7233)
Conservation Authority Permits
- Mississippi Valley Conservation Authority 613-253-0006 X 244
- Rideau Valley Conservation Authority 613-267-5353 X 131
Occupancy Groups
- Group A Occupancy – Assembly Occupancy
- Group B Occupancy – Care or Detention
- Group C Occupancy – Residential Occupancy
- Group D Occupancy – Business and Personal Service Occupancy Group E Occupancy – Mercantile Occupancy
- Group F Occupancy – Industrial Occupancy